
This studio was designed in a way that the students gets to work hands on with construction material. A total six individual installation was designed and constructed by the students. The projects were set up right along the lake side of CUET campus. Six individual sites were chosen with natural features, students requirements, need of the students and their pattern of daily use. This project has also made it to the national news paper on march 2021.
Project Courtesy '18 Batch.